The pipeline division has the support & resources that Marsau has been building since 1982.
Marsau offers a large variety of services.
Marsau’s pipelines division has installed 200 to 300 miles of of pipe per year in all sizes & types of pipeline over the last decade.
The sizes of pipe range from 3" to 24". With the newest part of our pipeline division we have pipeliner’s that are exclusive to Midstream Companies. In our steel division we have constructed more than 40 gas compressor stations from the first weld on the skid to turning on the station. We install, swap & replace compressor motors as needed.
Over the years we have worked for multiple Midstream companies. During this time we have constructed over 50 compressor stations, we have installed 300 miles of poly per year, ranging various sizes of pipe, from 4” to 24”. Since developing the pipeline division we have been averaging 115 miles of steel lines per year. Both transmission & gathering, DOT regulated systems.
Welders that are specialized is pipe fabrication, for launchers & receivers, meter piping, camel backs, above ground valve settings, compressor station piping, flow control piping, ultra-sonic meter skid piping & lact piping.
Hot taps on both steel & poly lines are performed by Marsau’s employees. We also perform stopples and do hydro-static pressure testing.
Great Salt Plains
GSPM-10" EAST MAIN GAS HEADER LAY 33,000' OF 10"
CWC 6" LAY 33,514' OF 6" STEEL s
10" SOUTH CHISHOLM WEST LAY 36,960' OF 10" STEEL
GSPM-6" SOUTH CHISHOLM WEST LAY 36,960' OF 6" STEEL
CWG JASPER LAY 5,600' OF 6" STEEL
COLONEL COBB 18-08-26 1H LAY 8,000' OF 6"
LAROCHE 1H LAY 7,958' OF 6" STEEL
COMANCHE 1H LAY 6,302' OF 6" STEEL
6" CWG STAMPEDE LAY 6,879' OF 6" STEEL
4" CWG STAMPEDE LAY 6,879' OF 4" STEEL
COLONEL COBB 18-08-26 1H LAY 8,000' OF 4" STEEL
SCWG 12" STEEL - DIXON LAY 21,120' OF 12" STEEL
SANDHILLS TO GADWALL LAY 18,117' OF 12" STEEL
SCWC 6" STEEL-LONGHORN LAY 14,381' OF 6" STEEL
SCWC 6" STEEL DIXON LAY 21,120' OF 6" STEEL
CWC THAMIN LAY 39,664' OF 4" STEEL
MATILDA 19-08-25 1H 12,087' OF 4"
SALLY SCULL 19-07-19 1H 583' 4" STEEL
CATTLE DRIVE 18-09-23 1H 1,384' OF 4" & 1,718' OF 4"
BOETTLER 1 MH INSTALL 1,715' 4" STEEL
MAGGIE 4" & 6" STEEL PIPELINE 4"STEEL-1138' 6"STEEL 1138'
ROY SUGGS 4" & 6" STEEL PIPELINE 4"STEEL-3500 6"STEEL 3500
DORA TO STAMPEDE LAY -18,812' OF 6" STEEL LAY -19,082' OF 4"
Kinder Morgan
WATONGA LINE - LAY 31,800 16”STEEL
CLR BLONDIE #1 LAY 4,288' OF 6" STEEL
FORE TRIUMPH WELL CON LAY 10,800' OF 8" POLY
TRIUMPH MADDOX 1/22WC LAY 2,833' OF 6" SDR11 POLY
Superior Pipeline
SOUTH PIEDMONT GATHERING LAY 111,300’ OF 12” STEEL
BIG MUDDY / LILLIAN Active 8,000' 12" STEEL PIPELINE
DANNEHL 1405 2-34MH 7,304' of 8" STEEL
PAN HANDLE EASTERN 12,778' OF 10" STEEL
RED BLUFF CORNELL LAY 1,200' OF 6" POLY
LEON TREECE LAY 1,300' OF 8" POLY
STEPHENS EMMERICH 3-6 INSTALL 3,969' POLY
RED BLUFF CHRISTENSEN LAY 10,567' 8" POLY
RED BLUFF RUSSELL3-31 Active 16,387' OF 10" POLY
EMMERICH 2-6H LAY 7,481' OF 10" POLY